An SOS Builders & Developers project at concept stage
QUESTIONS, ANSWERED

FAQs

Everything we're asked most before a project starts in Lahore, Sahiwal, or Dubai: cost, timeline, and control.

36
QUESTIONS ANSWERED
01GETTING STARTED

Getting Started

Whether SOS Builders & Developers is the right fit, and what happens first.

SOS Builders & Developers is an architectural design and turnkey contracting firm, founded in 2016, that carries a project through architecture, structural engineering, MEP (mechanical, electrical, plumbing) design, interior design, and on-site construction supervision, all under one roof. Instead of hiring an architect, then a separate structural engineer, then a contractor, you work with one team from the first sketch to final handover, in Lahore, Sahiwal, or Dubai.

02COST & PAYMENT

Cost & Payment

What drives price, how payment works, and where budgets go wrong.

There's no single number, because size, site conditions, material specification, and scope (design only versus full design and build) each move the total independently, but we give every client a real cost range in writing after the first site visit and brief review, not a vague estimate. We'd rather lose a quote to a competitor than low-ball one to win the conversation.

03TIMELINE & PROCESS

Timeline & Process

How long each stage takes, and what actually happens at each one.

For a typical single residence, concept through construction drawings runs 6 to 10 weeks, and construction itself typically runs 10 to 16 months depending on size and complexity, so a full concept-to-handover timeline usually lands between 12 and 18 months. Larger or multi-unit projects run longer; we give a project-specific schedule once we've reviewed the brief and site.

04DESIGN & CREATIVE CONTROL

Design & Creative Control

How much say you have, and what happens if you want to change your mind.

The concept stage is built around your input directly. We test two or three genuinely different massing directions against your brief and site, and nothing moves into design development until one direction is signed off by you. This isn't a single take-it-or-leave-it proposal; it's a working conversation with real alternatives on the table.

05STRUCTURAL & MEP

Structural & MEP

What structural and MEP design actually cover, and why sequencing matters.

MEP stands for mechanical, electrical, and plumbing, the heating and cooling, power, and water and drainage systems that have to be routed through walls, floors, and ceilings before they're closed up. It matters because MEP planned after the structural frame is finished usually means drilling through beams that weren't sized for it, or awkward workarounds that are visible in the finished building.

06CONSTRUCTION, RISK & GUARANTEES

Construction, Risk & Guarantees

What happens on site, who's accountable, and what protects you if something goes wrong.

Site supervision is handled by our own team, present through every phase of the build, not just at milestone visits. Specialist trades are engaged where the work genuinely requires them, but they build to our drawings under our on-site supervision, from our Lahore, Sahiwal, or Dubai office depending on the project, so the build is never handed off to a separate contractor's independent interpretation of the design.

STILL HAVE A QUESTION

Ask us directly instead.

If your question isn't answered above, send us the site, the brief, or just the question — we'll get back to you within two working days.